Engine Start Procedures
T-45A UJPT, E2-C2, ADV, & IUT Eng-24
brings fuel boost pumps on line
c.
GTS unit starts and reaches idle
speed of 86% within 20 seconds
GTS advisory light should illuminate within
20 seconds
NOTE: Protection circuits within the
Overlay 2
starting system will shut down the
After GTS Start
GTS if idle speed is not achieved
within 30 seconds after the GTS
button is pressed.
3.
ENGINE switch - START
Overlay 3
Engine Start
a.
Spring-loaded detent initiates engine
starting sequence
(1) GTS accelerates to 100%,
supplying air to starter
(2) Air turbine starter (ATS) rotates
N2 shaft
(3) The rpm should rise rapidly to
approximately 10%
Rotation advisory light illuminates
within 15 seconds
(4) ROTATION advisory light:
Indicates that N1 shaft is rotating
in correct direction with shaft
signal has been sent to IGNITION
switch) and that starting sequence
may continue
(8-03) Original
Page 24-11