CNATRAINST 3500.3
28 June 2001
SECTION VI
TRAWING COCKPIT CHART TEMPLATES (PAPER)
1
1
1
1
The total for each WING
0.9
0.9
Two data sets
1
0.9
NAPPI
of instructors AND
0.8
0.8
Primary & Advanced
1
0.8
aircraft
0.7
0.7
1
0.7
OR
0.6
0.6
TRAWING
1
0.6
Intermediate &
Backup charts with
0.5
0.5
1
0.5
Advanced Strike
breakout are required
0.4
0.4
0
0.4
1
1
Include E-2/C-2
0.3
0.3
Number of students completing Primary and Advanced
0
0.3
numbers
0.8 0.2
0.8
OR
PANEL 8
0.2
0
0.2
PANEL 1
Number completing Intermdiate and Advanced Strike
0.1
0.6 0.1
0 0.6
0.1
and
0
0
0 0.4
0
0.4
E-2/C-2
SOND J FMAM J J A SOND J F
S
N
J
M
M
J
S
N
J
0.2
0.2
PANEL 9
COMPLETERS (Mo)
CRITICAL RESOURCES
0
0
A
M
J
J
A
S
O
N
D
J
F
S
O
N
D
J
F
M
COMPLETERS (ANN)
1
1
1
1
Primary &
0.9
0.9
0.9
0.9
Students in Primary,
1
1
0.8
0.8
Multi-engine/Roatary
Ad
d
0.8
0.8
0.7
0.7
Intermediate or
The same information as above. Use this
OR
0.8
0.8
0.7
0.7
0.6
0.6
Advanced Phases
when more space is required to clearly display the
l
Intermediate &
0.6
0.6
0.5
0.5
0.6
0.6
include ADV, TS, and
information concerning a TRAWING's completion
0.5
0.5
Advanced Strike
0.4
0.4
0.4
0.4
E-2/C-2 for Strike
Include E-2/C-2
0.4
0.4
0.3
0.3
0.3
0.3
PANEL 10
numbers
0.2
0.2
0.2
0.2
0.2
0.2
PANEL 7
0.1
0.1
PANEL 2
0.1
0.1
0
0
0
0
0
0
S
N
J
M
M
J
S
N
J
S
N
J
MM
J
S
N
J
S
O
N
D
J
F
M
A
M
J
J
A
S
O
N
D
J
F
"X" Req'd/"X" Comp.
COMPLETERS (ANN)
STUDENTS IN TRAINING
1
1
1
1
1
1
1
1
The dCT for ADV Multi-
Primary & Advanced
The dCT for Primary
0.9
0.9
0.9
0.9
0.9
0.9
0.9
The dCT for Intermediate 0.9
engine/Rotary
Multi-engine/Rotary
& The FPY for T-34
0.8
0.8
0.8
0.8
0.8
0.8
0.8
phases include E-2/C-2 0.8
OR
OR
0.7
0.7
OR
0.7
0.7
0.7
0.7
0.7
0.7
& FPY for T-34 in
Intermediate & Advanced
The dCT for T-45 TS
0.6
0.6
The dCT for ADV Strike
0.6
0.6
0.6
0.6
0.6
0.6
E-2/C-2 Intermediate
Strike
0.5
0.5
&
or E-2/C-2
0.5
0.5
0.5
0.5
0.5
0.5
OR
Include E-2/C-2
0.4
0.4
0.4
0.4
&
0.4
0.4
0.4
0.4
The FPY for the
T-45 Advanced &
Label any above E as
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
The FPY for T-2
appropriate platforms
FPY for T-45
0.2
0.2
POOL
0.2
0.2
0.2
0.2
0.2
0.2
PANEL 4
PANEL 6
PANEL 5
0.1
0.1
0.1
0.1
PANEL 3
0.1
0.1
0.1
0.1
0
0
0
0
0
0
0
0
S
N
J
M
M
J
S
N
J
S
N
J
M
M
J
S
N
J
S
N
J
M
M
J
S
N
J
SNJMMJSNJ
PRE-LOAD
PRIMARY CT AND T34 FPY
INTERM CT
ADV CT & FPY
1. This cockpit chart reflects in general terms those entries
required and the placement of the panels on the overall chart. It
provides an 18-month depiction of data. An 18-month depiction has
been chosen as the standard to provide an ability to look back and
make comparisons over the six months prior to the start of the
execution fiscal year.
2. The templates provided may be modified to reduce crowding and a
"busy" appearance. A secondary "y" axis may be installed and the
range of an axis adjusted to gain proper spacing and avoid the
appearance of wide ranges in the data depicted.
3. Electronic templates provided offer the option of 12, 15, 18, or
24-month displays. Additionally, a separate template with only a
single center panel (no panel 10) is provided. The standardization of
charts and length of data displayed will be common across all
TRAWINGs. TRAWINGs may elect their own time period to reflect on
cockpit charts unique to their requirements. However, when used as a
"drill down" from the CNATRA cockpit charts the standard depiction
should be presented.
11