CNATRAINST 1550.6E
14 October 2003
processed. The log shall be updated and distributed to all
pipeline TRAWINGs quarterly.
e.
The SM/CM, as the Action Officer:
(1) If a TCR is deemed "URGENT" by the PTO, the SM/CM,
if required, may direct a stage conference be held. This can be
accomplished by physically gathering all appropriate
standardization instructors, CCCs, and PTOs from all affected
units, via telephone conference or electronic mail. All
personnel impacted by the prospective change, including academic
instructors, should be polled for their inputs before the change
is submitted for approval. Following conference resolution, the
SM/CM should submit the proposed change to the CCC for review and
further routing to the CNATRA PTO for final approval.
(2) If the TCR received by the SM/CM has been deemed
"NON-URGENT," the SM/CM should forward the TCR to the PTO via the
CCC for inclusion in the next scheduled phase curriculum
conference, as per Figure 3.4 and Figure 3.5.
3-4