CNATRAINST 3740.9D CH-2
15 December 2004
105.
Carrier Operations
a. In accordance with ref (g), the CNATRA LSO shall provide the CV(N) Strike Operations Officer with
the CNATRA Training Plan.
b. To ensure that the availability of adequate rest exists for flight deck personnel, CNATRA Training
Plans should not exceed 12 hours in length.
c. A Letter of Instruction (LOI) for each operating period shall be published by CNATRA. Scheduling
and completion priorities shall be determined no later than the Presail Conference.
d. For combined detachment, CNATRA shall task a TRAWING to designate a Ship and Shore
Detachment Officer in Charge.
e. CNATRA CQ operations shall not be conducted using waist catapults. Waist catapults may be used to
A)
launch diverting aircraft if required.
106.
FCLP Facilities
a. On combined CQ detachments, refresher FCLPs may be conducted on a case-by-case basis only if
expiration of currency is the result of ship or weather delays. Units are therefore encouraged to arrive fully field
qualified.
b. If refresher FCLPs are required while on a combined CQ detachment, the OIC or his representative
shall schedule FCLP periods at an adequate location. Scheduling conflicts and FCLP priority shall be determined
by the respective Force LSO.
A)
c. Arresting Gear must be rigged and in battery at a suitable divert field within 30 NM of the FCLP field.
I-2