CNATRAINST 1542.108E
08 April 2004
IRFP-03X and IRFP-04X must be complete prior
to IR-07X.
MOD 04:
FAM-19 and FAM-20 must be flown within 2
weeks prior to FCLP-02X.
FCLP simulator (FCLP-01S) shall be flown
prior to flight events.
EP-09S will be flown between CQFP-03X and
FCLP-08X.
Two night FCLP flights are required.
PHASE II
MOD 05/06:
AN-12SX and AN-13 may be flown prior to
completion of Phase I, but not concurrent
with FCLP CQ Phase.
TACF-07 and WEP-10X must be completed prior
to ON-09. (Students must have 24 hours
notice prior to each previously unplanned
ONAV event for preflight planning.)
ONAV-01 through ONAV-06X, ONFP-01 through
ONFP-04X, ON-01S through ON-03S, WEPFP-01
through WEPFP-05X, WEP-01S through WEP-06SX
and EP-10S may be done prior to completion of
Phase I, but not concurrent with Phase I
FCLP-CQ.
MOD 07:
ACM-01 must be flown after TACF-07.
OCF-03X
must be flown prior to ACM-01.
MOD 08:
EP-12S should be flown after CQ-08, three
night FCLP flights are required.
NFORM-05 should be flown within 2 weeks prior
to CQ-08.
NFAM-06 shall be flown within 2 weeks prior
to CQ-08.
2. Briefing and Debriefing. Adequate briefing time shall be
provided and utilized. The applicable items listed in the NATOPS
Pilot's Pocket Checklist and Briefing Guides must be briefed. For
multi-plane flights, all flight members, i.e., instructors,
observers, students, passengers, etc., will be briefed by the
flight leader in the briefing area. Although students may be
briefed early on fundamental techniques, all members of the
flight will be in attendance for the final "conduct of flight"
portion of the brief.
a. Briefing. The minimum items that must be briefed with
all members of the flight present are as follows:
(1) Weather.
(2) Sequence of events.
2