CNATRAINST 1500.4F
18 May 1999
INSTRUCTIONS FOR THE COMPLETION OF
STUDENT ESTIMATED COMPLETION DATE REPORT, RCS CNATRA 1500-7
Column 1
Class. Alphanumeric designation of the class
assignment of individual identified in Column 2,
listed in ascending order with oldest class first.
Column 2
Name. SSN plus as much as will fit of last name
and initials.
Column 3
Rank.
Entries shall be abbreviated.
Column 4
Service/Category/Overall grade of previous phase.
Column 5
Date Started.
Month, day, year started ground
school.
Column 6
Estimated Completion Date (ECD). Estimated month,
day, year student will be designated or will be
available for transfer to next phase of training
squadron.
Column 7
Weeks/Hops/Simulators (SITs). Number of weeks on
board, number of flights remaining and number of
SITs remaining.
Column 8*
Cumulative Grade, in decimal form. To be computed
and reported weekly following AN-10X or BI-11X.
(Basic s squadrons leave blank). For NFO only for
last 4 weeks in TRAWING.
Column 9
Wk Ex/A/C Xs/SIT Xs. Weeks excused from
scheduling, a aircraft Xs and SIT Xs since last
report.
Column 10*
Xs completed by fiscal year of individuals
estimated completion date. Assign all Xs to FY
completion date regardless of FY in which X was
completed.
* Production status report. Completed student production status
report below the last student listed.
PRODUCTION HOWGOZIT
FYXX PTR = 112
FYXX PTR = 130
FYXX
FYXX
STUDENT Xs COMPLETED ON THIS ECD
1384
NA
GRADUATED STUDENT Xs THIS FISCALYEAR (18X83)
1079
TOTAL
2463
FYXX
TARGET Xs THIS ECD
2617
PERCENT OF TARGET COMPLETED TO DATE
.9412
TOTAL
103
Example 3
B-4