|
| CHAPTER EIGHT
T-34C AIRCRAFT SYSTEMS FAMILIARIZATION
WORKBOOK
and moved forward into the EMERG POWER range to engage, the EPL provides a direct
mechanical linkage to the bellows and fuel metering pin in the FCU, thereby bypassing the
pneumatic function and scheduling fuel to the combustion chamber fuel nozzles. Since the FCU
will no longer have its normal fuel scheduling capability, the EPL must be moved forward
cautiously to prevent an overtemp, as no safety controls are operational.
8-6 POWER PLANT CONTROL SYSTEM
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |