Click here to make tpub.com your Home Page

Page Title: Answers to Study Questions
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



CHAPTER EIGHT
T-34C AIRCRAFT SYSTEMS FAMILIARIZATION
WORKBOOK
ANSWERS TO STUDY QUESTIONS
1.
power output, speed, condition, left
2.
2, 3
1, 4
3.
Power and beta
4.
Fuel off, feather, RPM
5.
reduction
6.
a., c.
7.
6, 2
3, 5
1, 4
8.
overspeed, high pressure oil, reduction gearbox, increase
9.
b., c.
10.  It is located on the reduction gearbox; it limits propeller RPM should the primary propeller
governor fail.
11. 2332; higher
12.
1950, 2150, 400, 500
13.  To control power turbine overspeed should there be a failure or malfunction of the
propeller pitch change assembly.
14.
c.
reduction, 550 SHP (1315 ft-lbs.), Py air
15.
16.  On the power control quadrant, the EPL provides a direct mechanical linkage to the
bellows and metering pin in the FCU.
8-10 POWER PLANT CONTROL SYSTEM


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business