| ACM 1 v 1 Defensive Maneuvering
T-45C TS, ADV & IUT ACMFP-03
(b) Keep 17 units AOA
(c) Execute vertical pitchup to
approximately 60 degrees nose-high
(4) As energy dissipates, commence roll-off
(barrel roll) using aileron and rudder to
complete roll
(5) Once nose-high attitude established by
fighter
(a) Pull for horizontal overshoot on top
(b) Maintain nose above horizon until
commencing follow on rolls to avoid
burying nose
NOTE: The remainder of the
procedures identical to rolling scissors
procedure appear in the offensive
lesson ACMFP-02.
c.
Termination
(1) Reasonlack of altitude
(2) Reaction
(a) Flatten rolling scissors (shorten vertical
separation)
(b) Convert into horizontal scissors
(c) Disengage
NOTE: As the rolling scissors
progress, about 2500 ft above the deck
is needed for a successful roll through
to stay in the rolling scissors.
(05-98) Change 1
Page 3-18
|