Airways Navigation Flight Procedures
ANFP-01; T-45C ADV RIFP-05
3.
Authorized instrument procedure to
destination airport having a standard or
special instrument approach procedure
4.
Pilot responsible for obstruction clearance
5.
ATC responsible for aircraft separation
G. Procedures for performing IFR to a visual
approach 1.9.1.6.1
1.
IFR procedure that is pilot requested but
authorized and controlled by ATC
2.
Clearance authorizes pilot to proceed
visually and clear of clouds to the airport
3.
Pilot must have the airport or the
proceeding aircraft in sight
4.
Reported WX, ceiling at or above 1,000 ft
AGL and visibility 3 sm or greater
5.
Separation
a.
If pilot has airport in sight but cannot
see the aircraft to be followed, ATC
retains responsibility for separation and
wake vortex separation responsibility
b.
If visually following a proceeding
aircraft, acceptance of the visual
approach clearance constitutes
acceptance of pilot responsibility for
maintaining safe interval and adequate
wake turbulence separation
NOTE: Standard cloud clearance
requirements are not applicable.
(5-99) Original
Page 1-23