Introduction to NATOPS & T-45A Configuration
T-45A UJPT, E2-C2, ADV, & IUT Eng-01
(1) Establishes minimum
requirements for training, initial
qualification in T-45A, and
currency in specific areas
4.
Part III, "Normal Procedure"
a.
Chapter 6, "Flight Preparation"
(Page III-6-1)
(1) Deals with the operation and
conduct of the mission
b.
Chapter 7, "Shore-based Procedures"
(Page III-7-1)
(1) Covers normal operating
procedures for operating the
aircraft ashore
(a) Begins at the flight line shack
(b) Ends with pilot leaving the
aircraft after engine shutdown
c.
Chapter 8, "Carrier-based Procedures"
(Page III-8-1)
(1) Expands and modifies shore-
based procedures to make them
applicable to carrier operations
(2) Adds procedures peculiar to
carrier operations
d.
Chapter 9, "Special Procedures"
(Page III-9-1)
(1) Found here are procedures for
operating the aircraft under unique
conditions
(8-03) Original
Page 1-11