CNATRAINST 1543.6C
09 JANUARY 2003
5.4.8
List the components which will always be included as part
of an MPF.
5.4.9
State the organization responsible for providing
administrative direction and support for MPS squadrons
during the operations outlined in OH 1-5.
5.4.10 Identify the United States Marine Corps (USMC) logistics
element that has primary responsibility for the material
readiness of MPF material prior to commitment of the MPF
to a contingency.
efforts, broken generally into contingency (deliberate)
planning and execution (time-sensitive) planning.
5.4.12 Identify the two distinct periods during which
5.4.13 Identify that phase of an MPF operation during which
units complete final preparations for movement.
5.4.14 Cite the activity that acts as the single point-of-
contact for the host nation support and external liaison
peculiar to aviation operations at airfields.
5.4.15 Identify the individual that has the responsibility to
accomplish the offload of MPS ships, either in-stream or
pierside.
5.4.16 List the three principal throughput groups of the
Arrival/Assembly Support Party (AASP).
5.4.17 Identify the group responsible for the preparation of the
port prior to the arrival of the Maritime Preposition
Squadron (MPSRON) and the throughput of supplies and
equipment as they are offloaded from the ship.
5.4.18 State which group is responsible for the control and
coordination of the offload of airlifted units and
equipment.
42