CNATRAINST 1542.125A
27 June 2002
MODULE
MEDIA
SYMBOL
DESCRIPTION
DURATION
02-41
T-45C/FC
FAM-09
FAMILIARIZATION NINE
1.3
Brief:
a.
QOD
b.
c.
PA configuration management
Introduction:
a.
Aircraft exterior preflight
b.
Postflight aircraft inspection
Practice:
a.
Checklists
b.
c.
Aircraft taxi
d.
Normal takeoff
e.
Standard departure procedures
f.
Course rules
g.
Turn pattern
h.
Slow flight maneuver
i.
Power off stall
j.
Landing attitude maneuver
k.
Landing attitude stall
l.
Approach turn stall and recovery
m.
Aileron roll
n.
Overhead pattern (break)
o.
VFR landing pattern
p.
Touch-and-go, full flaps/slats
q.
Roll-and-go, full flaps/slats
r.
Waveoff
s.
Simulated emergency (airborne)
t.
Precautionary approach (Abeam)
u.
Full-stop full flaps/slats
NOTE:
Allow 45 minutes between end of brief and
takeoff.
57