CNATRAINST 1542.125A
27 June 2002
MODULE
MEDIA
SYMBOL
DESCRIPTION
DURATION
08-06
OFT
CQ-02S
CARRIER QUALIFICATION TWO
1.5
SIMULATOR
Brief:
a.
QOD
b.
Preflight
c.
d.
Ground procedures
e.
Pattern entry
f.
Shore-to-ship checklist
Introduce:
Case II recovery
Practice:
a.
Case I recovery
b.
Pattern
c.
Start position
d.
Bolter/touch-and-go technique
e.
Response to waveoff and technique
f.
Carrier arrestment
g.
Post-arrestment procedures
h.
Catapult hookup
i.
Catapult launch procedures
j.
Pattern entry from catapult launch
k.
Case I/II departure
l.
m.
CQ-related emergencies
n.
Bolter with blown tire
o.
Carrier arrestment with blown tire
235