CNATRAINST 1542.57C
03 March 1999
PERIOD
REQUIREMENTS
SYMBOL
DESCRIPTION
DURATION
01-25
NA-05
NATOPS FIVE
1.5
T-2C
DUAL/FC
Introduce:
a.
Preflight
b.
Normal engine starts
c.
Ground operations
d.
Takeoff/Departure
e.
Area checkout/course rules
f.
Stall series
g.
Boost off exercises
h.
Aileron roll
i.
Wingover
j.
Normal descent
k.
Field entry/break
l.
Full flap landings
m.
Half flap landings
n.
No flap landings
o.
PPEL
p.
Engine Shutdown
q.
Postflight
01-26
NA-06S
NATOPS SIX SIMULATOR
1.5
2F101
Introduce:
a.
b.
PCL linkage failure
c.
Pitot static inst. failure
d.
AOA failure
e.
Landing emergencies
Practice:
a.
Selected emergencies
b.
Assymetric tip tank imbalance
22