CNATRAINST 1542.146
22 September 2000
PERIOD
REQUIREMENTS
SYMBOL
DESCRIPTION
DURATION
MOD 2-18
OFT-2
BASIC NAVIGATION SIMULATOR 1.5
2B37
2
Discuss
a.
Instrument lag
b.
Missed approach procedures
c.
Draft report
d.
GCA approaches
Introduce
a.
Missed approach procedures
b.
Draft
c.
GCA (2 minimum - PAR/ASR)
Practice
a.
NFO responsibilities
b.
c.
Jet Log
d.
DD-175
e.
Equipment operation
f.
Scan
g.
Communication procedures
h.
Departure
i.
Altitude selection
j.
En route course control
k.
Turn point procedures
l.
Time estimates
m.
Fuel management analysis
n.
Point-to-point navigation
o.
Metro/ATIS evaluation
12