Quantcast Deck personnel signals to pilot and deck crew

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Custom Search
 
  
 


Ship’s Brief
T-45 TS & ADV CQFP-05; IUT CQFP-03
B.
Deck personnel signals to pilot and deck crew
Sg 12, fr 17
9.7.2.4.6.1
NOTE: The yellow shirt directs the following signals to
pilots and/or deck crews. Signals performed above the
waist are directed to pilots; signals performed below the
waist are directed to deck crews.
DECK PERSONNEL
SIGNALS (1-6)
1.
Move ahead
2.
Slow down
3.
Turn left
4.
Turn right
5.
Proceed to next director
6.
Stop
7.
Emergency stop
Sg 12, fr 18
8.
Brakes off
9.
Move back (push back)
10. Install chocks
DECK PERSONNEL
SIGNALS (7-12)
11. Install tiedowns
12. Tiedowns installed/chocks installed
13. Remove chocks
Sg 12, fr 19
14. Remove chain tiedowns (breakdown)
15. Chocks and chains removed
DECK PERSONNEL
SIGNALS (13-15)
Page 5-28
(7-01) Original




 


Privacy Statement - Copyright Information. - Contact Us

comments powered by Disqus

Integrated Publishing, Inc.
9438 US Hwy 19N #311 Port Richey, FL 34668

Phone For Parts Inquiries: (727) 755-3260
Google +