CNATRAINST 1542.153A
12 March 2004
BEHAVIOR STATEMENT
STANDARDS
9.
Departure
● Begins when climb
● Complies with ATC/DP/flight plan
airspeed is
clearance or course rules, as
established and ends
appropriate.
when DP/published
departure is
complete or
established in
assigned working
area. If no
published departure,
ends when initiating
pitch change for
level-off.
10. Enroute Procedures
● Begins when
● Updates/validates planned time and
established at
assigned altitude,
safely and efficiently accomplish the
airspeed, and power
mission.
setting. Ends with
● Effectively uses FSS, PMSV, and ATIS
initial power
as required.
reduction for
● Maintains course centerline between
descent or entering
all NAVAIDs and fixes with minor
enroute holding.
deviations (if IFR).
● Executes point-to-point within 2 NM.
11.
Basic Instrument Maneuvers
● Accomplishes all maneuvers IAW FTI.
● Begins with initial
pitch and power
● Maintains basic aircraft control
setting and ends
parameters.
when aircraft is
● Maintains VSI within 200 FPM of
stabilized in
established parameters, if
straight-and-level
applicable.
flight or in
position for the
next maneuver.
IX-6