CNATRAINST 1542.150
08 August 2002
NOTE 1:
Open-book and Closed-book NATOPS examinations shall be
completed prior to FAM-12X. NATOPS examinations are
administered by the squadron and are paper/pencil
examinations.
NOTE 2:
Instrument Rating Flight Procedures and examination
should be completed prior to IR-01X and FAM-12X.
NOTE 3:
Instrument Rating Check (IR-01X) should be completed
prior to FAM solo (FAM-13).
NOTE 4:
PAs will be flown to a full stop only when dual.
NOTE 5:
A minimum of three breaks must be flown prior to
FAM-12X.
4. Standardization Stage.
Prepare the IUT for a NATOPS check in
the T-45C aircraft.
Includes: NATOPS simulators and flights (NA-01S through NA-14X)
and Formation Flight Procedures (FFP-01 through FFP-06X) to
support NA-09S and NA-10.
MODULE
MEDIA
SYMBOL
DESCRIPTION
DURATION
02-01
MIL
EMFP-01
START, GROUND, AND TAKEOFF
1.5
EMERGENCY PROCEDURES
02-02
CAI
EMFP-02
START, GROUND AND TAKEOFF
1.5
EMERGENCY PROCEDURES
02-03
MIL
EMFP-03
OPERATIONAL AND EJECTION
1.0
EMERGENCY PROCEDURES
(INCLUDE WORKBOOKS)
02-04
MIL
EMFP-04
ENGINE AND HYDRAULIC
1.5
EMERGENCY PROCEDURES
02-05
CAI
EMFP-05
ENGINE AND HYDRAULIC
1.5
EMERGENCY PROCEDURES
02-06
CAI
EMFP-06X
EMERGENCY FLIGHT PROCEDURES
1.0
EXAMINATION ONE
02-07
IFT/OFT
EP-01S
EMERGENCY PROCEDURES ONE
1.5
SIMULATOR
02-08
MIL
EMFP-07
CANOPY AND FLIGHT CONTROL
1.0
EMERGENCY PROCEDURES
(INCLUDE WORKBOOKS)
30